|
|
|
The following 3 projects were found for "Construction Support"
 |
GEI was retained by San Bernardino Valley Municipal Water District to design and provide construction management for 25,000 feet of 72-inch diameter steel pipe.
read more »
|
 |
On behalf of Raybestos Products Company (Raybestos), GEI completed a major removal action at the Shelly Ditch (the “Ditch”) located in Crawfordsville, Indiana. The removal action was required pursuant to a Unilateral Administrative Order issued by EPA, requiring the removal and proper disposal of soils containing elevated levels of polychlorinated biphenyls (PCB) and lead in the Shelly Ditch from the Raybestos facility to Whitlock Avenue, a length of county drainage ditch extending in excess of 3,000 feet.
read more »
|
 |
The US Capitol Visitor Center (CVC) is the largest addition ever made to the Capitol Building in Washington, D.C. The CVC building, 50 feet underground, will front the entire east front of the Capitol. The Capitol itself encompasses 775,000 SF, while the completed CVC will contain 580,000 SF on three levels.
read more »
|
|
|
|
|