Attachment A-1 – Draft 100% RTA1 Construction Drawings – inclusive of Remediation (Dredging, Capping and ISS), Bulkhead and Bridge Support, and TB1 Separation Wall Construction Design
- RTA1 DESIGN – 100% RTA1 REMEDIAL DESIGN – SUBMITTAL 02282020
- TB1 03-25-2020 100% Design Revision 1 Full size
- RTA1 – 100% BRIDGE SUPPORT CALCULATIONS_02-28-2020- Section 1
- RTA1 – 100% BRIDGE SUPPORT CALCULATIONS_02-28-2020 – Section 2
- 100% Bridge Support Designs – RTA1 – 100% BRIDGE SUPPORT DRAWINGS
- 100% Bridge Support Designs – RTA1 – 100% TECHNICAL SPECIFICATIONS AND PROVISIONS
- 100% Bulkhead Support Designs – Butler and Douglas – Bulkhead Support Design, Douglass Street – 100% Design Package
- Bulkhead Support Design, Butler Street – 100% Design Package, 2-24-20
Attachment A-2 – Technical Specifications
Attachment A-3
- Attachment A-3 – EPA Approved TB1 Design 100 Design Report
- Attachment A-3 – Appendix A – Design Memorandums
- Attachment A-3 – Appendix B – 30% Field Activity Reports_Section 1
- Attachment A-3 – Appendix B – 30% Field Activity Reports_Section 2
- Attachment A-3 – Appendix B – 30% Field Activity Reports_Section 3
- Attachment A-3 – Appendix B – 30% Field Activity Reports_Section 4
- Attachment A-3 – Appendix C – Powerhouse Grading Plan
- Attachment A-3 – Appendix D – Calculations
- Attachment A-3 – Appendix E – Construction Drawings
- Attachment A-3 – Appendix F – Technical Specifications
- Attachment A-3 – Appendix G – Community Air Monitoring Plan
- Attachment A-3 – Appendix H – Referenced Topographic Survey Plan
- Attachment A-3 – Appendix I – Health and Safety Plan
- Attachment A-3 – Appendix J – Construction Quality Assurance Project Plan
- Attachment A-3 – Appendix K – Materials Management Plan
- Attachment A-3 – Appendix L – Archaeological Monitoring Report (Draft)
- Attachment A-3 – Appendix M Estimated Construction Schedule and Assumptions
- Attachment A-3 – Appendix N – Operations Maintenance and Monitoring Plan
Attachment B – TB4 Lessons Learned
Attachment C – Project Team Communication Plan
Attachment D – Construction Implementation Plan
Attachment E – Sample Proposal and Change Notice Format/Change Notice Form – Schedule E and Schedule F
Attachment F – CM/GC Construction Scope of Work
Attachment G – Bid Form
Attachment G – Bid Form-Unit Rates
Attachment H – List of Pre-Mobilization CM/GC Submittals
Attachment I – General Terms and Conditions for Remediation Contractor
Attachment J – PSA General Conditions
Attachment K – Health & Safety Plan
Attachment L – Contractor Safety Requirements
Attachment M – Process Safety PHA Guidelines
Attachment N – Management of Change Procedure